Ziraat IFC — Parametric Timber and Acoustic Panels

COMPLETED WORK
At Ziraat Istanbul Finance Center, parametric design, internal framework and curved timber panel production were developed within the same project scope. KUKA robotic equipment was used to produce the acoustic panels and parametric timber surfaces.
FROM DESIGN TO PRODUCTION
From internal framework to curved timber surfaces
Internal framework designs were developed for the double-curved form of the conference hall. Curved timber panel production was considered together with this supporting framework. KUKA robotic equipment was used for the parametric designs and acoustic panels.
The construction photographs below show the installation process behind the finished surfaces.
Construction and installation
Project scope
- Parametric designs and acoustic panels
- Timber production using KUKA robotic equipment
- Internal framework design
- Curved timber panel production
Location: Istanbul Finance Center
Project area: 1,325 m²
Architectural design: KPF
Project company: Kalyon
Let us discuss your project
Contact us to discuss parametric timber surfaces, curved panels and bespoke production requirements.